Constructing a 2-storey building in Nigeria is an exciting investment, whether for residential or commercial purposes. With an estimated budget of ₦80 million to ₦120 million (excluding land acquisition), this comprehensive guide will help you understand the costs involved, construction timeline, required permits, and practical tips for effective project execution.
What Is a 2-Storey Building?
A 2-storey building is a structure with two floors stacked vertically, often used for residential homes, office spaces, or mixed-purpose buildings. These buildings maximize land use, offering more space while maintaining a smaller footprint.
Unique Features of a 2-Storey Building
- Efficient Land Use: Ideal for areas with limited land availability.
- Functional Layouts: Multiple rooms, bathrooms, and shared spaces.
- Design Versatility: Can include balconies, staircases, and terraces.
- Energy Efficiency: Options for natural ventilation and lighting.
- Customization: Tailored to personal or business needs.
Cost Breakdown for Building a 2-Storey in Nigeria
1. Foundation & Structure: ₦15M–₦25M
This phase involves excavation, foundation laying, and reinforcement to ensure stability.
2. Superstructure: ₦25M–₦35M
Covers the walls, columns, roofing, and structural framework of the building.
3. Interior Finishing: ₦15M–₦25M
Includes flooring, wall painting, ceilings, and interior decor.
4. Mechanical Systems: ₦10M–₦15M
This phase covers plumbing, electrical wiring, and essential utilities.
5. Furnishing & Fixtures: ₦10M–₦15M
Includes basic furniture, fittings, and lighting installations.
6. Landscaping & Exterior: ₦5M–₦10M
Focuses on outdoor aesthetics such as gardens, pathways, and gates.
7. Permits & Professional Fees: ₦5M–₦7M
Accounts for architectural designs, engineering consultations, and necessary approvals.
RECOMMENDED
- How to Build a 2-Bedroom Bungalow with 20 Million Naira in 2025
- 20 Leading Residential Construction Companies in Lagos State for 2025: Expert Builders
- Top 20 Commercial Construction Companies in Lagos for 2025: Find the Best Firms for Your Next Project
Construction Timeline
Building a 2-storey building in Nigeria typically takes 12 to 18 months, depending on the complexity of the design. Here’s an overview:
- Planning and Design: 2–4 months.
- Permits and Approvals: 1–2 months.
- Foundation and Structural Work: 4–6 months.
- Interior Finishing and Furnishing: 4–6 months.
- Final Inspections and Handover: 1–2 months.
Required Permits for Building a 2-Storey in Nigeria
To legally construct a 2-storey building in Nigeria, the following permits are necessary:
- Building Permit: Obtainable from your state’s urban planning authority (e.g., Lagos State Physical Planning Permit Authority for Lagos).
- Environmental Impact Assessment (EIA): Issued by the Federal Ministry of Environment.
- Zoning Approval: From local government zoning offices based on the location of the project.
- Fire Safety Certification: Obtainable from the Federal Fire Service.
- Business Registration (for commercial projects): From the Corporate Affairs Commission (CAC).
Construction Stages
- Pre-Construction:
- Site surveys, feasibility studies, and budgeting.
- Engaging architects and contractors.
- Foundation and Structural Work:
- Laying the foundation, erecting columns, and completing the frame.
- Utilities Installation:
- Plumbing, electrical, and HVAC installations.
- Interior Finishing:
- Painting, tiling, and installation of doors and windows.
- Landscaping and Final Touches:
- Enhancing the exterior and ensuring compliance with safety standards.
Factors Affecting Cost
- Material Prices: Varying costs of cement, steel, and other materials.
- Labor Costs: Influenced by the skill level and availability of workers.
- Location: Accessibility and regional price differences.
- Design Complexity: Unique architectural details and finishes.
- Economic Conditions: Inflation and foreign exchange rates.
Tips for Staying Within Budget
- Plan Thoroughly: Outline a clear budget and project scope.
- Source Locally: Purchase materials locally to save on transportation costs.
- Monitor Progress: Regularly review project milestones to avoid delays.
- Hire Professionals: Engage experienced architects and contractors.
- Prepare for Contingencies: Set aside 5–10% of your budget for unexpected expenses.
Hire JECCL for Your Building Construction in Nigeria
Ready to bring your 2-storey building project to life? At JECCL, we offer top-notch construction services tailored to meet your unique needs. Contact us today to start your journey with industry-leading expertise and precision.
- Phone: (+234) 08164538836, (+234) 08135862769
- Email: info@jeccl.com
- Address:
- Website: https://jeccl.com
FAQs About Building a 2-Storey in Nigeria
How much does it cost to build a 2-storey building in Nigeria?
The cost ranges from ₦80 million to ₦120 million, excluding land acquisition.
How long does it take to build a 2-storey building?
The construction timeline is typically 12 to 18 months, depending on design complexity.
What permits are required for a 2-storey building?
Key permits include a Building Permit, Zoning Approval, Environmental Impact Assessment (EIA), and Structural Integrity Approval.
How can I reduce costs during construction?
Effective strategies include thorough planning, sourcing materials locally, and hiring experienced professionals.
Why should I hire JECCL for my project?
JECCL combines expertise, reliability, and personalized service to deliver exceptional construction results.